WARM DAY HELPS IN COVERING A POLYTUNNEL -1st wk in June 2015

If truth be known, our plan was to have  a 7m by 24 m polytunnel,  from Highbank Ltd. (www.highbank.ie) in Kilkenny, constructed in early May. However, the requirement to have drainage work on the field in question carried out led to postponement of the polytunnel plan.

As luck would have it, the delay made for a better polytunnel job in the end. Liam and his father Tom were the experts from Highbank who undertook the construction work. A third helper on site was the CALM WARM WEATHER. Understandably, the less wind, the better when handling the second biggest sheet of plastic I have ever seen. The biggest was in Co. Clare where I helped organic farmer Jim Cronin and his friend to construct  a slightly longer polytunnel (pictured).

However, because plastic expands and becomes more pliable when warm, a sunny day is the best day to cover and tighten the polytunnel plastic. The result is that now we have a sturdy tunnel which soundsDSC06996 a bit like a bodhrán when you tap the tightly stretched plastic.

Now it is over to us to wheelbarrow in a few tonnes of well rotted horse manure and to get the tunnel producing. It will take a while to make a return on the investment, but here goes!

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: